36-01103 Rev. H February 6, 1997 Contract NAS8-37716 DR SDM02
Submitted to: | Submitted by: |
George C. Marshall Space Flight Center
National Aeronautics and Space Administration Marshall Space Flight Center, AL 35812 |
Center for Space Research
Massachusetts Institute of Technology Cambridge, MA 02139 |
Approvals: | |
Dr. Peter Ford | Dr. William Mayer |
Software Project Manager
Massachusetts Institute of Technology |
Project Manager
Massachusetts Institute of Technology |
Revision | Date (mm/dd/yy) |
ECO No. |
Page(s) Affected |
Reason | Approval |
---|---|---|---|---|---|
01 | 3/24/94 | - | All | Initial Release for Software Requirements Audit (as Doc. No. 36-61101-01) | |
02 | 7/27/94 | - | All | Updates as a result of the Software Requirements Audit (as Doc. No. 36-41001-02) | |
03 | 9/28/94 | - | 1-10, 12, 16, 19, 26, 27, 33, 34, 38, 46, 47, 48, 50, 55, 56, 68, 69, 73, 84, 92, 95, 104 | Updates for Software PDR, including Doc. No. correction | |
A | 2/17/95 | 36-130 | All | Corrections in response to Software PDR | |
B | 9/18/95 | 36-274 | All | Updates for CDR | |
C | 11/3/95 | 36-356 | All | Corrections to Rev. B and preparation for baseline. Added "goals" appendix as descriptive placeholder for potential enhancements. | |
D | 2/8/96 | 36-495 | All | Added requirements tracebility reference and hyper-links to all tables | |
E | 5/10/96 | 36-567 | 37, 38, 71, 74, 76, 91, 92, 140, 141 | Use 100KHz ACIS pixel clock to time-stamp events. CEI timing requirement relaxed to 10us | RFG 5/10/96 |
F | 6/17/96 | 36-623 | 22, 57, 83 | Removed initial CCD flush. Added "ignore n initial frames" parameter to Timed Exposure and Continuous Clocking Modes. | RFG 6/18/96 |
G | 12/26/96 | 36-823 | 3, 8, 12, 13, 17, 119, 122, 133, 134 | Remove auto-science-restart after watchdog timer.
Clarify BEP response to FEP reset. Updated Software Housekeeping format. Removed TBDs. |
RFG 2/6/97 |
H | 2/6/97 | 36-855 | 143 | To support back-side illuminated CCDs, implement Faint 5x5 Mode. |